Project name |
: |
100 MW Furnace Oil Operated Medium Term
Power Project at Puttalam
Transportation and installation of Heavylifts
(Engines, Generators and Transformers)
From Colombo Port to Puttalam Power Station
|
Location |
: |
Colombo Port to Puttalam Power Station |
Country |
: |
Sri Lanka |
Cargoes to be transported |
: |
6 units 18V46 Engine
(Dim: 13.60x4.20x6.10m - 280 Tons
each)
6 units Generator
(Dim:L4.60xW4.10xH4.50m - 77 Tons each)
2 units Transformer
(Dim:L5.00xW3.60xH4.30m - 62 Tons each) |
Equipments to be supplied |
: |
1 unit | 200'x60'x121 barge | 6 pcs | Wedge |
1 unit | 2400 BHP Tugboat | 47 pcs | Cross beam |
18 axlelines | Goldhofer | 12 pcs | Concrete block |
2 units | Prime mover | 4 pcs | Support |
3 pcs | Ro-ro ramp | 50 pcs | Steel plate |
2 units | 20' & 40' Contr
(Jacking equipments) | 2 pcs
1pc | Counter weight
Coupling beam | |
Operation period |
: |
14.1.04 - 21.3.04 |